Silver Petrucelli
Hamden, Conn., architecture, engineering and interiors firm. Studied Weston school facility options in 2019. Farmington: 2023 fire station facilities study and 2025 cost update for the Ad Hoc Fire Station Committee; architect of the 1928 Town Hall renovation; chosen Oct. 6, 2026 by the Fire Station Building Committee as final candidate for schematic design and cost estimate of the three fire station projects (contract to be signed by the town manager).